1

Precon recently celebrated a huge milestone

Precon recently celebrated a huge milestone – 600 days with no lost time incidents!  This is a huge accomplishment that we are incredibly proud of. Our people’s unwavering commitment to safety makes this a great place to work and keeps everyone going home to their families every night.

2017cf

Precon Career Fair

Precon is having a career fair this weekend, Saturday April 1st! The plant will be open from 11:00 AM – 1:00 PM, with donuts and refreshments provided. Please RSVP to our event on Facebook so we can plan accordingly. Application for employment can be completed at our plant the day of. Our plant is located… Read more »

feb17

New Technology

Exciting news.  This month Precon will be installing cutting edge production equipment.  This new equipment will increase our efficiency, decrease lead times, provide an even higher level of quality and add new and exciting product possibilities.  Stay tuned for more updates and information.

fi

Belly River Group Campground Culvert Replacement

Replacing an existing culvert with Precast Concrete 3-Sided Box Culvert. Precast concrete 3-sided box culvert is a durable drainage solution for a road crossing.  This 3-sided box culvert is designed to allow the top to be removed so that debris can be removed from the waterway.  The box units were constructed within a short lead… Read more »

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

333 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

#212, 160 Broadway Blvd.

Sherwood Park, Alberta

T8H 2A3

Contact Us


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.

Alberta Irrigation CHOA ECA AWWA WCWEA AWWA NPCA ARHCA LCA