See attached file for sizing
Check Structure
Overview
Precon’s Check structure controls water levels and velocity while measuring the flow, specifically when there is no change in elevation. Structures are multi-piece (typically 9-13) and assembled on-site in the shape of an ‘H’, perpendicular to the flow of water, which creates a double wall water cut-off, preventing bank erosion and seepage.
The structure is engineered and designed to USBR standards and works well in conjunction with the Inlet/Turnout to obtain necessary water levels for water delivery. The structure can handle water flow up to 3.5 m3/sec and can accommodate canal slopes of 2:1, 2.5:1 and 3:1. Precon’s Check structure can be upgraded with many popular gate systems, such as overshot and stop log systems.
Sizes
Uses
- Controls the level, storage, delivery and drainage of water
- Weir structure
Upgrades
- Grates (Vault)
- Handrails
- Walkways