Strathcona Snow Melt Facility - Precon

Strathcona Snow Melt Facility

strathcona installfi

Precast Control Structure and Hydrodynamic Separator to Treat Snow Melt
The creation of a snow dump facility in Strathcona County calls for treatment of the melting snow. A precast concrete control structure limits the rate at which water can flow downstream into the hydrodynamic separator. Inside the separator, sediments, oils, and floatables are retained and clean water exists downstream back into the natural system.
Products used: VS 1824, 2400φ manhole, Hydroworks Hydroguard HG 8

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

429 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

23012 - 110 Ave

Edmonton, Alberta

T5S 0A7

Contact Us


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.

Alberta Irrigation CHOA ECA AWWA WCWEA AWWA NPCA ARHCA LCA