Strathcona Snow Melt Facility

strathcona installfi

Precast Control Structure and Hydrodynamic Separator to Treat Snow Melt
The creation of a snow dump facility in Strathcona County calls for treatment of the melting snow. A precast concrete control structure limits the rate at which water can flow downstream into the hydrodynamic separator. Inside the separator, sediments, oils, and floatables are retained and clean water exists downstream back into the natural system.
Products used: VS 1824, 2400φ manhole, Hydroworks Hydroguard HG 8

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

333 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

#212, 160 Broadway Blvd.

Sherwood Park, Alberta

T8H 2A3

Contact Us


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.

Alberta Irrigation CHOA ECA AWWA WCWEA AWWA NPCA ARHCA LCA