M1 Canal Rehabilitation

Precast Inlet Turnout Structures and Precast Buildings for Water Conveyance for Irrigation Rehabilitation work on the M1 Canal involves the installation of new inlet turnout and vault turnout structures to provide water delivery to smaller reaches of the system and individual irrigators.  The trapezoidal cross section of the main canal requires large precast inlet structures… Read more »


Calgary Airport Authority – South Glycol Treatment Facilities

Precast Control Structure for Glycol Retention A runway expansion at the Calgary International Airport required increased capacity for Glycol treatment and retention. Combining two precast structures to control inlet flow allowed the project to be completed in minimal time and without the need of heating and hoarding and with minimal overhead hazards effecting airport traffic…. Read more »

strathcona installfi

Strathcona Snow Melt Facility

Precast Control Structure and Hydrodynamic Separator to Treat Snow Melt The creation of a snow dump facility in Strathcona County calls for treatment of the melting snow. A precast concrete control structure limits the rate at which water can flow downstream into the hydrodynamic separator. Inside the separator, sediments, oils, and floatables are retained and… Read more »

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

333 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

23012 - 110 Ave

Edmonton, Alberta

T5S 0A7

Contact Us

Please leave this field empty.

Please leave this field empty.

Please leave this field empty.

Please leave this field empty.