M1 Canal Rehabilitation

IMG_0519FI

Precast Inlet Turnout Structures and Precast Buildings for Water Conveyance for Irrigation

Rehabilitation work on the M1 Canal involves the installation of new inlet turnout and vault turnout structures to provide water delivery to smaller reaches of the system and individual irrigators.  The trapezoidal cross section of the main canal requires large precast inlet structures that can accommodate multiple services.  Insulated precast buildings provide protection for critical operational components of the system.

Products used: IS 3005 (multiple sizes), BD 2530, VS 1818

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

333 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

#212, 160 Broadway Blvd.

Sherwood Park, Alberta

T8H 2A3

Contact Us


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.

Alberta Irrigation CHOA ECA AWWA WCWEA AWWA NPCA ARHCA LCA