Calgary Airport Authority – South Glycol Treatment Facilities

20151214_123912fi

Precast Control Structure for Glycol Retention
A runway expansion at the Calgary International Airport required increased capacity for Glycol treatment and retention. Combining two precast structures to control inlet flow allowed the project to be completed in minimal time and without the need of heating and hoarding and with minimal overhead hazards effecting airport traffic.
Products used: VS 2530, VS 3040

We're here to help

(403) 327-2711

(800) 661-8020

Station Main

PO Box 128

Lethbridge, Alberta

T1J 3Y3

(403) 257-2999

(800) 661-8020

333 4615 112 Avenue SE

Calgary, Alberta

T2C 5J3

(780) 423-2731

(800) 661-8020

#212, 160 Broadway Blvd.

Sherwood Park, Alberta

T8H 2A3

Contact Us


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.


Please leave this field empty.

Alberta Irrigation CHOA ECA AWWA WCWEA AWWA NPCA ARHCA LCA